Construction & Civil Engineering - Thames Wharfe 1A - 1B

Client: Birse Civils

This contract was in two phases. Phase 1A was to build a 420 square metre maintenance building including all formwork, steelfixing, concreting, blockwork and over 5000 square metres of reinforced concrete paving works.

Phase 1B was a seven week contract reduced to 4 weeks. This included 400 metres of reinforced concrete bases and retaining walls and work to piles. The job was completed ahead of schedule in just 23 days.

After the completion of these phases Dyneema then constructed bases for EDF.