Construction & Civil Engineering - Becton Water Plant

Client: Birse Water

Work at the Thames Water Treatment Works at Beckton, involved the renovation of an existing pond and the construction of tank bases, transformer bases, cable trenches and engine bases. Dyneema Construction and Civil Engineering also built the hardstandings for tankers and the high and low voltage bases.

The whole project was constructed in reinforced concrete, with a large element being below the ground.

Click on Thumbnail to Enlarge: