Dyneema Construction
Here are a selection of Dyneema Construction & Civil Engineering Ltd projects.

Construction & Civil Engineering - M20 Junction 10 Ashford Roundabout
Norwest Holst

 

Works carried out to the widening of the existing bridges over the M20 to provide an additional lane. The works include excavation and insertion of service ducts complete with inspection boxes.

Breaking out of concrete, removing waterproofing to expose existing reinforcement connect couplers and concrete.

Click on Thumbnail to Enlarge:

 
Construction & Civil Engineering - Tesco express stores Tunbridge wells

Client: Tesco

Tesco Tunbridge was a 12week programme,to remove external walls by propping taking care not to disturb chimney and 1st floor walls.

To extend the store an 120sqm extension was erected.Floating slab to stop moisture penetrating through slab, new foul/rainwater runs throughout,

Tarmac car park to take weight of heavy artics.

 

  • Works included
  • Temporary propping
  • Demolition
  • Floating concrete slab
  • Brick/blockwork Extension
  • Foul and rainwater drainage
  • Ducts for BT,GAS,ELECTRIC,WATER
  • CAR PARK

 

 
Construction & Civil Engineering - Becton Water Plant

Client: Birse Water

Work at the Thames Water Treatment Works at Beckton, involved the renovation of an existing pond and the construction of tank bases, transformer bases, cable trenches and engine bases. Dyneema Construction and Civil Engineering also built the hardstandings for tankers and the high and low voltage bases.

The whole project was constructed in reinforced concrete, with a large element being below the ground.

Click on Thumbnail to Enlarge:

 
Construction & Civil Engineering - Thames Wharfe 1A - 1B

Client: Birse Civils

This contract was in two phases. Phase 1A was to build a 420 square metre maintenance building including all formwork, steelfixing, concreting, blockwork and over 5000 square metres of reinforced concrete paving works.

Phase 1B was a seven week contract reduced to 4 weeks. This included 400 metres of reinforced concrete bases and retaining walls and work to piles. The job was completed ahead of schedule in just 23 days.

After the completion of these phases Dyneema then constructed bases for EDF.

Click on Thumbnail to Enlarge:

 
Construction & Civil Engineering - Olympic Park Lee Interchange

Client: Volker Highways

Volker Highways hired Dyneema Construction and Civil Engineering Ltd to design and construct a retaining wall around the perimeter of the Olympic Park to deter intruders. The wall, with its gabion stone front started with the steel fixer. The carpenters then used peri shutters, finishing the project on schedule.

Click on Thumbnail to Enlarge:

 
Construction & Civil Engineering - Thames Wharfe 1A - 1B

Client: Birse Civils

This contract was in two phases. Phase 1A was to build a 420 square metre maintenance building including all formwork, steelfixing, concreting, blockwork and over 5000 square metres of reinforced concrete paving works.

Phase 1B was a seven week contract reduced to 4 weeks. This included 400 metres of reinforced concrete bases and retaining walls and work to piles. The job was completed ahead of schedule in just 23 days.

After the completion of these phases Dyneema then constructed bases for EDF.

Click on Thumbnail to Enlarge: