Construction & Civil Engineering - Tesco express stores Tunbridge wells

Client: Tesco

Tesco Tunbridge was a 12week programme,to remove external walls by propping taking care not to disturb chimney and 1st floor walls.

To extend the store an 120sqm extension was erected.Floating slab to stop moisture penetrating through slab, new foul/rainwater runs throughout,

Tarmac car park to take weight of heavy artics.

 

  • Works included
  • Temporary propping
  • Demolition
  • Floating concrete slab
  • Brick/blockwork Extension
  • Foul and rainwater drainage
  • Ducts for BT,GAS,ELECTRIC,WATER
  • CAR PARK